Showing posts with label Yoemite. Show all posts
Showing posts with label Yoemite. Show all posts

Friday, February 3, 2012

Yosemite Daily Report for Feb. 3

Remember, to start planning your Yosemite vacation, visit www.YosemiteThisYear.com


Daily Report - Yosemite National Park
Friday, February 03, 2012

WEATHER

Yosemite Valley
Today: Sunny, with a high near 49.
Tonight: Mostly clear, with a low around 30.
Saturday: Sunny, with a high near 49.
Sunday: Mostly sunny, with a high near 49.

El Portal
Today: Sunny, with a high near 65.
Tonight: Mostly clear, with a low around 34.
Saturday: Sunny, with a high near 66.
Sunday: Mostly sunny, with a high near 67.

Wawona
Today: Sunny, with a high near 57.
Tonight: Mostly clear, with a low around 27.
Saturday: Sunny, with a high near 57.
Sunday: Mostly sunny, with a high near 58.
*************************************************
HAPPENING TODAY

Live Local Bluegrass at the Carabiner
Come one come all! The Mountain Heirs are opening for the Tresspassers Friday, February 3rd at the Carabiner. The picking and grinning will start around 7:30 or 8 and it's a FREE show. Come support our local favorite local talent and dance the night away. (E. Brosk - 2/3)
_______________________________________________________

6th Street Cinema
Located upstairs in the historic Old Masonic Lodge on 6th Street, in downtown Mariposa. Film Entrance is $7 per film for non-members; non-member students pay $5. Monthly membership is $12 allowing film entry for $3 each. (Please note: we are not accepting credit cards this year.)
www.sixthstreetcinema.org . This week: Feb. 3rd - 4th (Friday Saturday) 7:30 p.m. BLUEBEARD. Controversial filmmaker Catherine Breillat puts a new spin on an ancient story in this multileveled drama. Set in France in the mid-' 50s , a young girl enjoys scaring her sister with dramatic telling of Bluebeard. As she relates the story, we're taken back to the 15th century to meet the sinister Bluebeard in a non-traditional telling of the original story. (Rated R; 90 min.; in French with English subtitles). Watch the trailer here: http://trailers.apple.com/trailers/independent/bluebeard/ (T. Arfsten - 2/1)

*************************************************


PARK AND PARTNER NEWS

Remembering Ryan Hiller - Mourning Bands
We want to thank the Yosemite Community for their outpouring of support as we mourn the loss of Ryan Hiller a DNC Employee and 2011 Seasonal Ranger at Little Yosemite Valley.  PWR Director Chris Lehnertz set a message today that recognizes Ryan and all the seasonal employees who contribute to stewardship and preserving Yosemite and other NPS sites.  To honor Ryan, the Superintendent has approved the wearing of mourning bands through February 11, 2012.  Please keep Ryan's family, friends, and co-workers in your thoughts. (C. Cuvelier - 2/3)
_______________________________________________________

Badger Pass Snow Report - 2/3
The skiing and riding is really good! Come on up and see for yourself. Visit our Facebook page to see current photos.
Base Depth: 12” – 24”
New Snow: 0”
Snow Conditions: Powder, Packed Powder
Runs Groomed: Bruin, Eagle, Rabbit, Turtle,
Lifts Open: Turtle, Bruin, Eagle, Badger
Runs open: All except  Beaver
Groomed XC trails: Fresh Tracks from Badger Pass to Bridalveil Campground on Monday Morning January 30, 2012.
XC trail snow conditions: Good with some road showing.
No Tubing, need more snow   (S. Costello - 2/3)
_______________________________________________________

Tuolumne Meadows Winter Report
We're just glad to finally be on skis! Let it snow (just a little more, please)!
http://www.nps.gov/yose/planyourvisit/tmconditions.htm?customel_dataPageID_307668=472152 (L. Pilewski - 2/2)

*************************************************

CONSTRUCTION UPDATE


Fire Management to Resume Debris Pile Burning in El Portal and Foresta
Yosemite fire management may resume hand pile burning in El Portal and Foresta with help from the forecasted rain. Localized flames and smoke will be visible but impacts should be negligible and short lived. In an ongoing effort, park, state and private fire crews have created forest debris hand piles in and around the communities of Foresta and El Portal. These piles are being made to reduce biomass and create a 'defensible space' fuel break around Yosemite's vulnerable Wildland Urban Interface communities. Additionally, thinning, piling and burning can restore fire dependant ecosystems and set the stage for the progressive management of future natural or prescribed fires. Please contact Kelly Singer @ 372-0413 or Taro Pusina @ 375-9576 with any questions. (T. Pusina - 1/20)
_______________________________________________________

Village Store Closed
The Village Store will be closed for remodeling beginning Tuesday, January 17th and will reopen on Thursday, February 16th @ Noon. (1/18)
_______________________________________________________

UPDATE - Foresta Road Closure thru 2/29/12 - Slide Repair Between Rancheria and Old El Portal

The current road closure along Foresta Road will continue thru the end of February 2012. Due to the unseasonably dry weather crews made good progress on the upper (cut) slope stabilization and it is nearly complete, however the steep slopes required much of the work to occur with hand labor, so they were not able to make as much progress as planned. The remaining work includes the final seeding and mulching along the upper slope, then installation of a retaining wall along the lower (fill) slope, and then the final curb and pavement repairs. (M. Pieper - 1/6)

**************************************************


ACTING DESIGNATIONS


Madelyn Ruffner (379-1226) is on a 120-day detail as Acting Environmental Planning and Compliance Program Manager. Madelyn may be found at her regular desk location in the EPC Trailer. Elexis Mayer (379-1377) has temporarily moved to the Planning Trailer to continue her work on the Merced River Plan. For further assistance, you may also contact Jessica Zeek (379-1002), Administrative Support Assistant for Environmental Planning and Compliance.

Jack Hoeflich will be acting Valley District Ranger until further notice.
Andy Fristensky will be Acting Deputy Chief of Interpretive Operations until further notice. He may be reached at 372-0599.

Jeffrey Trust
will be Acting Yosemite Valley Field Interpretation Supervisor until further notice. He may be reached at 372-0307.

Ron Watson
will be the Acting Supervisory Information Technology Specialist until further notice. He may be reached at 379-1074.

Brenna Lissoway
(379-1283) is on a detail as the Park Archivist. If you have need to access the Archives, or have archive related questions, you can call 379-1282 or 379-1104.

Friday, January 13, 2012

Yosemite extends Half Dome permitting process


Yosemite News Release
January 13, 2012
For Immediate Release

Media Contacts:
Scott Gediman 209-372-0248
Kari Cobb 209-372-0529

               Yosemite National Park Announces Extension of
              Interim Permit Program for the Half Dome Cables
                Program Extended for the 2012 Hiking Season

Yosemite National Park will require Day Use Permits seven days per week for climbing the Half Dome cables during the summer 2012 season.  This is an extension of the interim permit system that was implemented beginning in 2010.  Permits will be required seven days per week to ascend the Half Dome cables.  This is part of an interim program designed to address crowding and safety issues on the cables.

Hiking to the top of Half Dome is one of the most popular hikes in Yosemite National Park.  The iconic granite monolith, at 8,842 feet above sea level, attracts people from all over the world who attempt to climb to the summit.
Most visitors ascend Half Dome via the cables, which are typically in place from mid-May through mid-October.  Most visitors begin and end their hike at Happy Isles in Yosemite Valley.  This is an approximately 14-mile round-trip journey.

Applications for permits are available from March 1 through March 31.   The
park will allocate permits through a preseason lottery, a two-day in advance lottery, and as part of the Wilderness Permit process.  Details regarding the lotteries and the wilderness process can be found at the park’s website at www.nps.gov/yose/planyourvisit/hdpermits.htm.  The lottery will be conducted through www.recreation.gov.

The park is expecting to release the Half Dome Trail Stewardship Plan Environmental Assessment (EA) later this winter.  This document will address use on the trail and the cables and provide alternatives on a permanent management plan for the Half Dome cables.  The park strongly encourages public comment on the plan during the formal comment period.

Yosemite National Park will provide more detailed information regarding the Day Use Permit lotteries and other pertinent information about the Half Dome Trail soon.

                                   -NPS-

Thursday, September 8, 2011

Yosemite Daily Report for Sept. 8


Daily Report - Yosemite National Park
Thursday, September 8, 2011

WEATHER

Yosemite Valley
Today: Mostly sunny, with a high near 84.
Tonight: Partly cloudy, with a low around 54.
Friday: A chance of showers, with thunderstorms also possible after 11am.
Increasing clouds, with a high near 84. Chance of precipitation is 30%.
Saturday: A 50 percent chance of showers and thunderstorms. Cloudy, with a high near 82.


For your Yosemite trip, visit www.YosemiteThisYear.com

El Portal
Today: Sunny and hot, with a high near 105.
Tonight: Partly cloudy, with a low around 60. Northwest wind between 5 and
14 mph, with gusts as high as 18 mph.
Friday: A chance of showers, with thunderstorms also possible after 11am.
Increasing clouds and hot, with a high near 106. Winds could gust as high as 21 mph. Chance of precipitation is 30%.
Saturday: A 50 percent chance of showers and thunderstorms. Cloudy and hot, with a high near 102.

Wawona
Today: Sunny, with a high near 92.
Tonight: Partly cloudy, with a low around 45.
Friday: A chance of showers, with thunderstorms also possible after 11am.
Increasing clouds, with a high near 93. Winds could gust as high as 20 mph.
Chance of precipitation is 30%.
Saturday: A 50 percent chance of showers and thunderstorms. Cloudy, with a high near 90.

Tuolumne Meadows
Today: A 20 percent chance of showers and thunderstorms after 11am. Mostly sunny, with a high near 65.
Tonight: A slight chance of showers and thunderstorms. Mostly cloudy, with a low around 41. Wind gusts as high as 20 mph. Chance of precipitation is 20%.
Friday: A chance of showers, with thunderstorms also possible after 11am.
Mostly cloudy, with a high near 62. Wind gusts as high as 20 mph. Chance of precipitation is 30%.
Saturday: Showers and thunderstorms likely. Cloudy, with a high near 59.
East wind around 6 mph becoming calm. Chance of precipitation is 60%.

***************************************************

HAPPENING TODAY

Sal's Tonight
Now that we are no longer in danger of being burned up (thanks Fire Crews!) Sal's Taco Wagon will return today, Thursday. Please join Yosemite Employee Association for another great evening at the El Portal Community Hall.
Bring a fire fighter and buy them a beer to thank them for their hard work.
Remember to keep our bears safe and alive by busing your tables, recycling, and keeping our community clean. Be the change you wish to see. As always, designated drivers get free sodas. (M.Dale - 9/8)

___________________________________________________________________


Wawona Tunnel Work Continues
The High Voltage Crew will be in the Wawona Tunnel beginning September 6,
2011 through September 8, 2011 replacing light bulbs.  Due to the work being performed, there will be controlled traffic via pilot car to allow the crew to work safely while replacing the bulbs. They will be working between the hours of 7:00 am and 2:30 pm each day.  If you have any questions or concerns, please call Dan Raspotnik, HV Supervisor at 379-1236. (M. Christiansen - 9/6)


***************************************************

CONSTRUCTION UPDATE

Yosemite National Park to Rehabilitate Sewer Main under Northside Drive this Fall The NPS has hired Erick Ammon Inc., (Anderson, CA) to rehabilitate approximately 2 miles of the main sewer  under Northside Drive, between Bridalveil Falls View and the Big Oak Flat Road/El Portal Road
intersection.    Nighttime construction work starts this week and will
consist of sewer main cleaning and video inspection between the hours of
midnight and 6:00 a.m.    (M. Wichmann 9/7)


***************************************************


PARK AND PARK PARTNER NEWS
Sharepoint Site Unavailable on Saturday, Sept 10 The park SharePoint site will be unavailable Saturday,  September 10th, from 08:30 a.m. to approximately 1:00 p.m. so that maintenance can be performed on the site. If the proposed date/time of this service outage is particularly bad for you, please contact Paul Gallez at 209-372-0250 as soon as possible.  (P. Gallez - 9/8) ______________________________________________________

Updates on The Sierra Nevada Network Summer Monitoring Projects The Sierra Nevada Network has been busy with the following projects this
season:
Bird Monitoring - The bird monitoring field crews were surveyed 27 of 30 transects at Yosemite. The bird monitoring began in mid-May and ended July 24, to coincide with the time frame that birds are breeding and nesting in Sierra Nevada parks. The Institute for Bird Populations (IBP) conducted the field monitoring.  Stay tuned for some bird highlights from this first season in The Sierra Nevada Monitor fall newsletter. If you have questions about this project, please contact Program Manager Alice Chung-MacCoubrey (559-565-3788).

Lake Monitoring - 2011 is the fourth season of the lake monitoring project.
Lake crews started monitoring the last week of July and their season will extend through late September. They collect and filter water chemistry samples and do shoreline amphibian surveys at each site. Crews are visiting
25 randomly selected lakes scattered throughout the high country in SEKI and YOSE.

High-elevation Forest Monitoring - This is the first season of monitoring for high-elevation whitebark and foxtail pine forests in SEKI and YOSE, and the first of three years for plot installations. Crews installed 11 whitebark pine plots in Yosemite and seven  foxtail pine plots in Sequoia.
For more information, contact SIEN Ecologist Shawn McKinney at 209-379-3291. (L. Mutch - 9/8)



**************************************************


ACTING DESIGNATIONS


Jun Kinoshita is Acting Anthropology Branch Chief for the week of September 5. Jun can be reached at 379-1317.


Kristin Ramsey will be the Acting Branch Chief of Interpretive Services from Sept. 1 to Sept. 19.


Dale St. Vincent has been selected as the acting Administrative Officer until the AO position is permanently filled.


Karen Kolbeck has been selected as the acting Supervisory General Supply Specialist. Karen can be reached at 379-1028.


Ron Watson has been selected as the acting, Supervisory IT Specialist until the position is permanently filled. Ron can be reached at 379-1074.

Brenna Lissoway (379-1283) is on a detail as the Park Archivist. If you have need to access the Archives, or have archive related questions, you can call 379-1282 or 379-1104.


**************************************************


COMMUNITY NEWS


6TH STREET CINEMA
Sept. 9-10 (Friday - Saturday)  7:30 p.m.: WASTELAND. (In partnership with KVPT, Valley Public Television; Not rated; 99 min.) Jardim Gramacho is a Brazilian landfill, not far from Rio de Janeiro, that's said to be the largest refuse dump in the world, Lucy Walker's documentary explores Brazilian born artist Vik Muniz's creative process as he fashions amazing art from what others have left behind. But, the film also profiles the people who live near the landfill and make their living by sorting what's useful from what is not.  The cinema is located upstairs in the historic Old Masonic Lodge on 6th Street, in downtown Mariposa. Entrance is $7 per film for non-members; non-member students pay $5. Monthly membership is $12 allowing film entry for $3 each.  More information is available on the
website: www.sixthstreetcinema.org  (T. Arfsten 9/7) __________________________________________________________


For Rent
Call Sierra Foothill Homes 742-5380 for units below.
Midpines - brand new 3 bedroom 2 bath manufactured home in adult park.  No pets; community pool. Near store and bus stop.
Midpines - small space for travel trailer/5th wheel with hook ups (by day or by month with small deposit).
Near Mariposa (3 miles) - 4 bedroom, 2 bath on  5 acres  on creek-front property.  Available now.
Near Mariposa  - newly updated 2 bed / 2 bath mobile  with garage.  Nice area.  $700.
Mariposa - Mobile Home in town - 1 bedroom 1 bath mobile. $550.  Available in September.
Triangle Road - 3 Bed 2 Bath Manufactured Home - Handicap accessible, nice and roomy.
Tip Top Area -  2 bed 1 bath cabin.  Available now. (Y. Radanovich - 9/6) __________________________________________________________


For Rent
Studio apartment - Mariposa. $500/month. First and last month rent required; renter will be responsible for propane and electricity. Located at 5069 Lakeview Road (2-3 miles from town). Available October 1. Phone
(209) 742-5015; Al and Betty Bedard. (Y. Radanovich - 8/31)